The wait task waits on one or more tasks before continuing. This can be helpful when separate sequences need to be synchronized.

tasks/wait-1.svg

In this example, the wait task waits for Build_Linux to complete before continuing on to Package_Windows. This allows both Build_Linux and Build_Windows to execute in parallel but prevents Package_Windows from executing before the linux build completes. Presumablely the linux build performs tasks that need to complete before the Package_Windows step can execute.

The wait task's configuration from the example above is shown below.

tasks/wait.png

The conditions can be added, edited or deleted by the buttons below the table. The condition used in the example is shown below.

tasks/wait-2.png

All of the conditions in the table must be satsified before the task succeeds. If any of the tasks complete or a sequence stops before a tasks that is being waited on can run, the wait task will fail.